ACE · Services · Kitchen Remodeling

The room you already live in,
made worth living in.

From a tight Encino classic to a wall‑down open plan. Plans, permits, and price, all in writing before a single cabinet comes down.

Pillar 01 · The Visualizer

See your kitchen, in your style, in eight seconds.

Visualize Your Kitchen
See it before you sign

Your kitchen today.
Your kitchen in 60 seconds.

Upload one photo. Pick your style, your finish, your features. Our AI shows you the finished space in eight seconds. No call. No deposit. No "schedule a consultation." You see it. Then we talk price.

After Before
Today
60 seconds
Drag to compare
60
Seconds to render
$0
Free to try
300+
LA homes since 2014
Visualize my kitchen

3 recent kitchen builds.

From the studio
Open Plan

A 1973 ranch, opened to the back yard.

Sherman Oaks
California Classic

White oak, brass, and a stove that anchors the room.

Encino
Luxury Build

Marble, walnut, and an espresso wall built in.

Brentwood
Built for LA

The way LA kitchens actually get built.

Old galvanized swap‑outs in Valley ranches. Title 24 hood and lighting compliance. Engineered beams when a wall comes down. We have done these on 300+ LA homes. Plan check has never failed twice.

LADBS Plumbing RerouteTitle 24 VentilationHVAC Re‑LoadingEngineered BeamSoft Water PermitTitle 24 Lighting
The real number

In writing, before we sign.

Mid‑tier kitchen $65K–$95K
Luxury kitchen $120K–$250K
Typical timeline 8–14 weeks on site
Permit timeline 3–6 weeks plan check
Questions we get

What people actually ask.

Will you pull the permit yourselves?

Yes. We file every permit at LADBS. The timeline lives in your contract.

Can we live in the house during the remodel?

Usually not for the demo and rough phases. We can phase the job if you need a working sink. We will be honest about it.

What if you find something behind the wall?

We carry a known contingency. You see it before signing. You sign every change order.

Do you do appliances?

We coordinate with your designer, source from your spec, install per code.

How long until you can start?

Eight to fourteen weeks from signing, depending on permit and your scope.

Eight services, one studio

Other things we build.

Bathroom Remodeling

Explore →

ADU & Garage Conversion

Explore →

Backyard Remodeling

Explore →

Whole Home Remodeling

Explore →

Home Additions

Explore →

Hardscape

Explore →

Landscape

Explore →
Talk to us

When you're ready, we are.

Tell us about your project. We respond within two hours on weekdays. No quote bait, no spam.

Thank you.

We will be in touch within two hours on weekdays. If you would like to skip the call entirely, try the AI Visualizer first.

Call Now Free Quote